Skip to main content

Culvert Replacement

District maintenance crew has completed the replacement of a deteriorated roadside culvert adjacent to 575 NW & 118th Ave. & C-2 Canal. This infrastructure improvement supports proper drainage into the canal system and helps prevent readway and property damage during heavy rain events.

The image shows a grassy area by a road featuring metal piping, wooden posts, and a stop sign in the background.
A drainage pipe spilling into a stagnant waterway, surrounded by grass and debris, with trees in the background.
A corrugated metal pipe is placed near a shallow water channel, with caution tape nearby and surrounding dirt and gravel.
The image shows road work with traffic cones, a rolled-up drainage pipe, and disturbed ground near a residential area.